Site C Dam RCC Buttress Waterstops
Peace River, BC
Client: AECON-Flatiron-Dragados-EBC Partnership
Date Completed: 2022
The Generating Station and Spillways at the Site C Dam are constructed on a roller-compacted concrete buttress. Emagineered Solutions, Inc. was contracted to supply and install our CYLutions™ waterstop in the control joints between the RCC monoliths. The work was performed at 13 joint locations in three phases between April 2021 and September 2022.